csiupgrades
scada & dcs
 Go

UCOS Pipeline SCADA Case Studies

With more than 20 years experience, CSI's case studies document pipeline SCADA challenges around the world.

Highlights

Large American Pipeline Case Study  

CSI replaced a large American pipeline's Vector SCADA system with UCOS for it's master station and is upgrading control systems at 4 dozen pump stations.

Alyeska Case Study  

Alyeska Pipeline Services Co. is installing UCOS as the primary SCADA master station for the Trans Alaska Pipeline.

KNPC Case Study  

CSI helped the Kuwait National Petroleum Co. rebuild its fuel delivery infrastructure after the Iraqi invasion of 1990.

ADNOC Case Study  

UCOS controls a bulk depot, the pipeline that supplies the depot, and an upstream pumping station for the Abu Dhabi National Oil Co.

Expertise

Pipelines

Pipeline Features

Pipeline Case Studies 

Large USA Pipeline

Alyeska

KNPC

ADNOC

Water/Wastewater

Water Features

Water Case Studies

Fuel Terminals

Terminal Features

Terminal Case Studies

Facility Control

Facility Features

Facility Case Studies

Water SCADA