Alyeska Pipeline Services Co.

Application: |
Master Station SCADA and Data Historian Interface. |
Scale: |
2,725 input points, 239 control points on the pipeline; 1,968 input points and 407 control points at the marine terminal; 14 data acquisition units on the pipeline (each pump station, the North Pole metering facility, and the Petro Star metering facility); 24 units at the marine terminal; 14 metering units. |
Solutions: |
Data acquisition and control; alarm and data processing; display; and interfaces to historical archiving and reporting, interfaces to APSC hydraulic modeling, leak detection, and seismic evaluation systems. |
Scope: |
Design specification development, systems and equipment acquisition, system configuration and testing, drawings and documentation, installation and commissioning support, training, product and system support, field services. |
Details: |
For more on this project, see articles in Control Engineering, OilOnline, and Pipeline & Gas Journal (February 2004).
You may also contact CSI for more information. |
|